Univercell+ cellulose insulation (injection)
Environmental Impact
Production Carbon
Not available
Declared Unit
1.0 m2
Valid Until
Sep 2031
Product Details
Insulation
EPD International AB
Greenize
Construction products (EN 15804+A2) 1.3.3
2026-09-23
Description
Waste is allocated based on the polluter pays principle. The end-of-life system boundary of the product system is set where outputs of the system have reached the end-of-waste state. Examples of these outputs are materials, products or construction elements. This approach ensures that all waste processing during any module of the products system is included up to the system boundary of the respective module.Personnel-related processes, such as transportation of employees to and from work, are not accounted for, in line with the PCR 2019:14 v2.0.1. Capital goods and infrastructure could not be fully excluded from the upstream, core and downstream processes with reasonable effort, as they are integrated in background processes of the database references.